Phone:
+1 877 302 8632
Fax:
+1 888 205 9894 (Toll-free)
E-Mail:
orders@antibodies-online.com

TIMP3 ELISA Kit

This Colorimetric ELISA kit is designed for the quantitative measurement of Monkey TIMP3.
Catalog No. ABIN5510572
$519.00
Plus shipping costs $50.00
96 tests
Shipping to: United States
Delivery in 4 to 7 Business Days

Quick Overview for TIMP3 ELISA Kit (ABIN5510572)

Target

See all TIMP3 ELISA Kits
TIMP3 (TIMP Metallopeptidase Inhibitor 3 (TIMP3))

Binding Specificity

AA 24-211

Reactivity

  • 13
  • 7
  • 6
  • 6
  • 6
  • 4
  • 4
  • 4
  • 4
  • 3
  • 1
  • 1
  • 1
  • 1
Monkey

Detection Method

Colorimetric

Method Type

Sandwich ELISA

Detection Range

156 pg/mL - 10000 pg/mL

Application

ELISA

Sample Type

Cell Culture Supernatant, Plasma (EDTA), Plasma (heparin), Saliva, Serum
  • Minimum Detection Limit

    156 pg/mL

    Purpose

    Sandwich Monkey primate TIMP-3 ELISA Kit to quantitate Monkey TIMP3 in cell culture supernatants, serum, plasma (heparin, EDTA) and saliva.

    Analytical Method

    Quantitative

    Specificity

    Expression system for standard: NS0
    Immunogen sequence: C24-P211

    Capture antibody and Detection antibody: monoclonal antibody from mouse, polyclonal antibody from goat

    Cross-Reactivity (Details)

    There is no detectable cross-reactivity with other relevant proteins.

    Sensitivity

    < 2 pg/mL

    Components

    1. Pre-coated 96-well strip microplate
    2. Standard
    3. Biotinylated antibody (100x)
    4. Avidin-Biotin-Peroxidase Complex (100x)
    5. Sample Diluent
    6. Antibody Diluent
    7. Avidin-Biotin-Peroxidase Diluent
    8. Color Developing Reagent (TMB)
    9. Stop Solution
    10. Wash Buffer (25x)
    11. Adhesive plate sealers

    Material not included

    Microplate Reader capable of reading absorbance at 450nm. Incubator. Automated plate washer (optional). Pipettes and pipette tips capable of precisely dispensing 0.5 μL through 1 mL volumes of aqueous solutions. Multichannel pipettes are recommended for large amount of samples. Deionized or distilled water. 500 mL graduated cylinders. Test tubes for dilution.
  • Application Notes

    Before using Kit, spin tubes and bring down all components to bottom of tube. Duplicate well assay was recommended for both standard and sample testing.

    Sample Volume

    100 μL

    Plate

    Pre-coated

    Protocol

    ELISA Kit is based on standard sandwich enzyme-linked immune-sorbent assay technology. An antibody has been precoated onto 96-well plates. Standards and test samples are added to the wells, a biotinylated detection antibody specific for target is added subsequently and then followed by washing with PBS or TBS buffer. Avidin-Biotin-Peroxidase Complex was added and unbound conjugates were washed away with PBS or TBS buffer. HRP substrate TMB was used to visualize HRP enzymatic reaction. TMB was catalyzed by HRP to produce a blue color product that changed into yellow after adding acidic stop solution. The density of yellow is proportional to the target amount in sample captured in plate.

    Assay Precision

    Intra-Assay Precision (CV%): 7%, 6.8%, 6.2%
    Inter-Assay Precision (CV%): 8.5%, 8.2%, 8.1%

    Restrictions

    For Research Use only
  • Handling Advice

    Avoid multiple freeze-thaw cycles.

    Storage

    4 °C,-20 °C

    Storage Comment

    Store at 4°C for 6 months, at -20°C for 12 months. Avoid multiple freeze-thaw cycles (Ships with gel ice, can store for up to 3 days in room temperature. Freeze upon receiving.)

    Expiry Date

    12 months
  • Target See all TIMP3 ELISA Kits

    TIMP3 (TIMP Metallopeptidase Inhibitor 3 (TIMP3))

    Alternative Name

    TIMP3

    Background

    Background: The tissue inhibitors of metalloproteinases (TIMPs) are natural inhibitors of the matrix metalloproteinases, a group of zinc-binding endopeptidases involved in the degradation of the extracellular matrix. The TIMP3 gene is expressed in many tissues, with highest expression in the placenta. TIMP3 encodes a potent angiogenesis inhibitor and is mutated in Sorsby fundus dystrophy, a macular degenerative disease with submacular choroidal neovascularization. TIMP3 gene is mapped to 22q12.1-q13.2. Mutations in TIMP3 cause the autosomal dominant disorder Sorsby's fundus dystrophy (SFD).

    Gene Full Name: TIMP metallopeptidase inhibitor 3

    Gene ID

    574381

    UniProt

    P35625
You are here:
Chat with us!